shower room

  • Bathroom… Done!

    By : Categories : House Refurb Comment: 0 Comment

    Just in time for our planned moving in date, and after many late nights the first bathroom was finally completed & declared ready for use. Sink/Loo units (minus seat & a post-installation cleanup) Installed shower head & screen Shower! What isn’t pictured here is the plumbing installation needed in the loft – working in conjunction [...]

    Read More →
  • Bathroom 8

    By : Categories : House Refurb Comment: 0 Comment

    We’re definitely on the home straight with this room now. The ceiling’s been painted, and work’s started on fitting two essential bits of equipment – a WC and basin. In a moment which would have clearly been aided by hindsight, we opted for “built in” bathroom furniture with a back-to-the-wall WC and matching basin – [...]

    Read More →
  • Bathroom build 4 – Tiling!

    By : Categories : House Refurb Comment: 0 Comment

    With all the prep work completed, the time had finally come to make a start on tiling. Tiles were arranged with full-height tiles around the shower tray to minimise joints, and work began… Progress…. More progress…! Link to this post!

    Read More →
  • Bathroom build 3

    By : Categories : House Refurb Comment: Comments Off

    With the ceiling boarding complete, we started taping & jointing the boards to provide a (hopefully) smooth finish to the new ceiling. The joins were taped with plasterboard tape and skimmed over with a thin coat of plaster. After letting this go off for 24 hours we then attacked the ceiling with a sanding pad [...]

    Read More →
  • Bathroom build…2

    By : Categories : House Refurb Comment: 0 Comment

    With  the tray installed, waste pipework installed & tested & floor screwed firmly down we were able to make a start on the final bits & pieces of building work needed along with installing the shower. Working on the basis that without it, fitting a concealed shower would basically need most of the blockwork wall [...]

    Read More →