  • Bathroom – 7

    By : Categories : House Refurb Comment: 0 Comment

    Kicking off by partially draining down the heating system again, the pipework was quickly checked for the new towel rail – at which point it became rapidly apparent that more work was needed. Somehow one of the concealed radiator pipes had ended up 1cm adrift from where it needed to be to line up with [...]

    Read More →
  • Bathroom – 6

    By : Categories : House Refurb Comment: 0 Comment

    An evening of grouting later, the floor’s looking like it’s finished – and most importantly, is nearly ready for installation of a new WC, sink & heated towel rail. Link to this post!

    Read More →
  • Bathroom build …. 5

    By : Categories : House Refurb Comment: 0 Comment

    Tiling’s well underway, and with all the wall tiles firmly in place we made a start on the floor. Started the tiles from the shower tray, with a view to keeping as much floor as possible covered by tiles where splashes are likely! Leaving the first couple of rows to set overnight, the next step [...]

    Read More →
  • Bathroom build 4 – Tiling!

    By : Categories : House Refurb Comment: 0 Comment

    With all the prep work completed, the time had finally come to make a start on tiling. Tiles were arranged with full-height tiles around the shower tray to minimise joints, and work began… Progress…. More progress…! Link to this post!

    Read More →
  • Bathroom build 3

    By : Categories : House Refurb Comment: Comments Off

    With the ceiling boarding complete, we started taping & jointing the boards to provide a (hopefully) smooth finish to the new ceiling. The joins were taped with plasterboard tape and skimmed over with a thin coat of plaster. After letting this go off for 24 hours we then attacked the ceiling with a sanding pad [...]

    Read More →