More mountains moved!

Great progress today – starting to feel like the house is slowly coming together now.


Lounge plastering is well underway; bedroom 1 has had all of the remaining mess/carpet tape removed along with the first coat of paint on the replastered walls & ceiling and the remaining paintwork in bedroom 2 completed.

We’ve also made a bit of a positive discovery – all of upstairs bar the ensuite extension has good quality floorboards throughout rather than chipboard.

Does mean that we need to hire a floor sander for longer than thought but also means we don’t need to recarpet everywhere!

A quick test of the varnish we’re looking to use seems to have resulted in a nice finish on sanded boards – which is good even if it does seem to need 3 coats!!

Next steps are to finish off the bedrooms and to get the lounge painted once the plasterer’s finished.

Lots more to do throughout however!!!!

Quick Update…

Haven’t posted anything to here for a while, but work is needless to say very much ongoing!

Since the last post bedroom 1 has been replastered (and is still currently slowly drying out before we can paint it!); walls & ceiling in bedroom 2 have been repainted; walls in the “en-suite” have been repainted and we’ve finished wallpaper stripping in the lounge and ripped out & removed a “window seat” in the bay window along with cleaning up the resulting mess it left behind.

IMG_0009The first piece of plumbing work has also been completed seeing some pipes (which presumably used to feed some sort of corner wash basin in one of the bedrooms) that had been left rising from the floor, capped off underneath the floor along with the excess removed.

I did briefly debate using those new-fangled push-fit fittings to cap the pipes but ended up going with a more traditional compression IMG_0006 fitting… Was working on the basis that if the pipework is going to be tucked away under the floorboards I’d rather know that the caps were secure and not going to weaken over time or suddenly decide to part company with the end of the pipe. The idea of suddenly acquiring an unexpected water feature in both a bedroom and the corner of the lounge ceiling really doesn’t appeal!!

Finally, we’ve also had a couple of builders out to come and quote for knocking down the dividing wall between what is currently a kitchen utility area and a dining room – intention being to create a larger open-plan kitchen-dining area rather than keeping a smallish utility and a formal dining room.

Next steps to include installing coving in the bedrooms; painting bedroom 1’s new plaster, and having the lounge, hallway & stairs replastered to finally removing one of 1970’s finest creations – floor to ceiling patterned Artex….!!!