Busy week ahead…!
Nov 20th
Just a quick update to say that a busy week is coming up…
Progress today includes lots of ground work to prepare the way – getting a couple of rooms nearly ready to finish off when a floor sander arrives on monday!

Window sills have been painted & coving “installed” in both main bedrooms. Tomorrows job will probably need to be painting said coving, along with a freshly prepared radiator & removing all upstairs carpets!!

Finally, we’ve just about lined someone up to do battle with the garden. It’s a job that’s at the end of a long list of things that need doing but needs to be done…

Decorating progress
Nov 19th
Now the plaster’s done, it’s time to crack on with the rest of the house.
The first couple of coats of paint have been applied to the main bedroom to seal & cover the newly dry plaster, and this weekend’s job is to start getting the proper top-coats of paint done along with all the woodwork, window sills, skirting, door frames etc.
We’ve also been getting on with fitting coving to the nearly completed bedroom 2, and are in the progress of lining up various quotes for flooring downstairs & removal of an unwanted wall!
More mountains moved!
Nov 8th
Great progress today – starting to feel like the house is slowly coming together now.
Lounge plastering is well underway; bedroom 1 has had all of the remaining mess/carpet tape removed along with the first coat of paint on the replastered walls & ceiling and the remaining paintwork in bedroom 2 completed.
We’ve also made a bit of a
positive discovery – all of upstairs bar the ensuite extension has good quality floorboards throughout rather than chipboard.
Does mean that we need to hire a floor sander for longer than thought but also means we don’t need to recarpet everywhere!
A quick test of the varnish we’re looking to use seems to have resulted in a nice finish on sanded boards – which is good even if it does seem to need 3 coats!!
Next steps are to finish off the bedrooms and to get the lounge painted once the plasterer’s finished.
Lots more to do throughout however!!!!
Quick Update…
Nov 6th
Haven’t posted anything to here for a while, but work is needless to say very much ongoing!
Since the last post bedroom 1 has been replastered (and is still currently slowly drying out before we can paint it!); walls & ceiling in bedroom 2 have been repainted; walls in the “en-suite” have been repainted and we’ve finished wallpaper stripping in the lounge and ripped out & removed a “window seat” in the bay window along with cleaning up the resulting mess it left behind.
The first piece of plumbing work has also been completed seeing some pipes (which presumably used to feed some sort of corner wash basin in one of the bedrooms) that had been left rising from the floor, capped off underneath the floor along with the excess removed.
I did briefly debate using those new-fangled push-fit fittings to cap the pipes but ended up going with a more traditional compression
fitting… Was working on the basis that if the pipework is going to be tucked away under the floorboards I’d rather know that the caps were secure and not going to weaken over time or suddenly decide to part company with the end of the pipe. The idea of suddenly acquiring an unexpected water feature in both a bedroom and the corner of the lounge ceiling really doesn’t appeal!!
Finally, we’ve also had a couple of builders out to come and quote for knocking down the dividing wall between what is currently a kitchen utility area and a dining room – intention being to create a larger open-plan kitchen-dining area rather than keeping a smallish utility and a formal dining room.
Next steps to include installing coving in the bedrooms; painting bedroom 1’s new plaster, and having the lounge, hallway & stairs replastered to finally removing one of 1970’s finest creations – floor to ceiling patterned Artex….!!!